What to Prepare Before a Website Project Starts

Prepare five things before a website project starts: a clear goal for the site, the copy or a plan for who writes it, images you have the right to use, access to your domain and hosting, and one person who can make decisions. Content is the item that delays most projects, and it is almost never the development that runs late.
What is the site actually for?
Write one sentence describing what a successful visit looks like. Not what the site should contain, what it should cause.
Book a consultation. Submit a quote request. Place an order. Understand the offer well enough to call.
This sounds obvious and it is the thing most briefs skip. Without it, every design decision becomes a matter of taste, and taste arguments have no resolution. With it, most decisions answer themselves.
Who is writing the copy?
Decide this before the project starts, because it is the single most common cause of delay.
Three options: you write it, the agency writes it, or you supply notes and the agency shapes them. All three work. What does not work is leaving it undecided and discovering in week four that everyone assumed someone else was handling it.
If you are writing it, start now rather than when the design is ready. A layout built for copy that does not exist yet almost always has to be redone once the real words arrive.
Do you have images you can legally use?
Photography is the second most common delay, and the legal part catches people out.
You need images you own or are licensed to use. An image taken from a search results page is not either of those, and the consequences arrive as a letter rather than a warning.
If you do not have photography, decide early whether to commission it or use stock. Original photography of your actual team and work is materially better for a service business, and it also takes weeks to arrange.
Can you get into your own domain and hosting?
Check now, not on launch day.
Find out who registered the domain, who the hosting account belongs to, and whether you can log into both. If a former developer registered your domain under their own account, you want to know that in week one, not on the evening you planned to go live.
This is a ten minute check that has rescued more launch dates than any other item on this list.
Who makes the decisions?
One person, named, with the authority to approve.
Design by committee produces designs that satisfy the committee and nobody outside it. Every extra approver adds a round of revisions and a compromise, and the compromises accumulate into something nobody chose.
Gather input from as many people as you like. Have one person decide.
What about your existing site?
If you have one, two things need handling before launch rather than after.
A list of the current URLs and where each one goes on the new site. Anything that currently ranks or gets linked to needs redirecting, and a redesign that skips this step is the most common way a business loses traffic overnight.
And a record of what is currently working. If a page brings enquiries, that is worth knowing before someone redesigns it into something prettier and quieter.
Frequently asked questions
A straightforward business site is usually four to eight weeks from approved scope. Ecommerce and applications take longer. The most common cause of overrun is waiting on content and access from the client side.
Not all of it, but you need a decision about who is writing it and a realistic date. Design and copy work best together, and a layout built around placeholder text usually gets rebuilt.
Decide early between commissioning and stock. Original photography of your team and work performs better for a service business, and arranging it takes weeks, so it belongs at the start of the project rather than the end.
Only if URL redirects are skipped. Map every existing URL to its new destination before launch and the rankings carry over. This is the step that gets missed most often and costs the most.
Talk it through with us
If you would rather not work this out alone, tell us what you are trying to decide. Free, 30 minutes, and we will give you a straight answer even when it is not a project for us.
Call +1 647-997-0557 · Email info@sklentr.com
Sklentr, Toronto, Ontario, Canada
